Current site: Peikko Middle East (English). Do you want to change country or language?
Around 400 concrete columns with a height of almost 20 metres were quickly, easily, safely erected without the need of temporary bracing thanks to Peikko's column connections. By using Peikko's system, the construction company saved a lot time, manpower and costs.